rubix
 
 
 
  REGIONAL EXPERIENCE
Gulf of Mexico

FIELD / AREA
PROJECT DESCRIPTION
Typhoon

IPM for field development planning of a number of subsea developments tied back to tension leg platform including assessment of potential upgrades to TLP throughput capacities.

Determine reason for gravel pack failure in new well completion

Exploration Well (8300 ft WD) Temperature/pressure simulations, complete casing and tubing stress analysis and material specifications for 30,000 ft subsea well, with BHP > 21,000 psi. Designed for drilling, testing, and long-term production operations.
Pompano IPM for production allocation. Open Server link from morning reports and field database to monitor and match well tests and to allocate production based on daily wellhead pressures.
Holstein (4400 ft WD, dry tree development with a SPAR) Well Performance Studies, input to Development Plan·
Sand Control Studies, and Frac Pack/OHGP preliminary designs·
Tubing Stress and Temperature Predictions, including Riser Thermal Performance·
Time and Cost Estimates for Project Sanction
Devil’s Tower IPM for green field planning purposes. Deepwater, multi-stacked reservoirs, co-mingled production. Open Server step-wise prediction to automate timing of completion sequencing and optimisation of production handling agreement
Vermillion IPM built to analyse 54 reservoirs and 43 wells for prediction of field performance under alternative operating scenarios.
Morpeth Well Test Design Supervision and Analysis or Exploration and Development Wells.·
Reservoir Simulation Study.·
Field Development and Completion Studies (see Deepwater Experience)
Green Canyon 18 High IslandMain Pass 73Chinook GC18 Update Integrated Production Modelling (IPM’s) of multiple reservoirs, wells, facilities and platforms using the Petroleum Experts (PetEx) linked suite of software MBAL/PROSPER/GAP. Prepared short and medium term forecasts, identified bottlenecks, review well test quality and additional testing needs; identified uplift opportunities at well and facility level.·
Input to Review on Casing Collapse and Gravel Pack Failure Analysis Studies.
Green Canyon 18 Simulation of a Single Sand Pool to determine Coning/Cusping Limits and Ultimate Recovery
Various Conceptual Development Studies and Deepwater Prospect Evaluations. ·
Parametric Studies on Development Costs and Economics.·
Well Testing Guidelines·
Technical Training on:
- Well Performance Analysis for Gravel Packed and Gaslifting Wells
- Completion Equipment
- Completions Planning
- Sand Control and Gravel Packing·
General Technical Support·
Participated in Sand Control system selection and performance monitoring workshops
Allegheny Field Development and Completion Studies including SMART completions (see Deepwater Experience).