LOCATION |
PROJECT DESCRIPTION |
| Holstein, Gulf of Mexico (4400 ft ss, dry tree development with a SPAR) |
Well Performance Studies, input to Development Plan
Sand Control Studies, and Frac Pack/OHGP preliminary designs
Tubing Stress and Temperature Predictions, including Riser Thermal Performance
Time and Cost Estimates for Project Sanction |
| Allegheny, Gulf of Mexico (3300 ft ss, horizontal tree subsea development with mini-TLP) |
Development Plan Review and Revisions
Critical Analysis of SMART Well Technology and Equipment Qualification Requirements
Sand Control Studies and Frac Pack/HRWP Design
Tubing Stress and Temperature Predictions
Contractor Selection
Sand Control Studies
Completion Equipment Selection
Review of Production Problems
Input to Completion Programs
Offshore Supervision of Completion Operations |
| Morpeth, Gulf of Mexico (1700 ft ss, horizontal tree subsea development with mini-TLP) |
Evaluation of Purchase
Conceptual Development Plan
Contractor Alliance Terms
Casing and Completion Design
Sand Control Studies and Frac Pack/HRWP Design
Plan, Supervise, Analyse Delineation Well Test
Production and Completions aspect of Dev. Plan
Reservoir Simulation Study on Waterflooding
Completions Design Studies and Options
Equipment and Services Selection
Subsea Interface and Operability Studies
Completion Programming and Offshore Supervision
Well Test Analysis on a Development Well using pressure data from subsea wellhead |
| Gulf of Mexico, General (up to 5000 ft) |
Preliminary Evaluation at Seastar Concept
Scoping Study on Deepwater, Marginal Field Developments
Parametric Studies to identify Development Prospects
Review of Farm-in and Exploration Opportunities
Well Test Manual for Offshore Operations |
| World-Wide |
Preparation of Deepwater Testing Guidelines |
| Gulf of Mexico, General |
Reservoir, Operations and Test Design aspects of a report on Extended Testing in Deepwater
|