Project Description/Services Provided by APA
Cohasset-Panuke

PP3C, PI1B

Planning and supervision of 2 offshore high rate gas tests. Scope of work included planning, detailed program preparation, offshore test supervision, and data collection and analysis. Production rates were in excess of 50 MM scf/d of sour gas.
White Rose Field

L80, A17, N30

Grand Banks

Planning and supervision of 4 DST’s (on 3 separate wells). Scope of work included well test manual preparation, detailed program preparation, offshore supervision, and data collection and analysis. These well tests included procedures for downhole wireline sampling, surface read-out, and production logging of multiple test intervals while flowing.
East Lost Hills

California

Casing and tubing design, material specifications, completions design, completion/test procedures, and test supervision for five ultra-HPHT (planned for 21,000 ft, 18000 psi, 385oF, sour gas) wells.
West Bonne Bay

C-23, Grand Banks, Canada

Prepared design basis, equipment specifications, equipment and contractor selection, and programming. Provided offshore supervision for one DST.
Morpeth, GoM,

USA

Prepared completion and gravel pack designs, contract philosophy/equipment selection, and completion and well test programs for deepwater appraisal and development wells in 1700 ft. of water in the Gulf of Mexico, including offshore supervision and test analysis. Prepared Deepwater Test Manual.
NWT, Canada

Prepared detailed procedures, equipment designs and test programs for a sour gas HPHT well test in a deviated well; including on-site supervision, test analysis and reporting. Prepared Well Test Manual.
Tunisia

Designed and supervised deep (4500 m) onshore gaswell tests on multiple zones using pressure operated DST tools, including well test interpretation.
Yemen

Prepared a detailed well testing procedures and equipment manual for DST’s and production tests. Supervised initial well tests using ESP's and temporary generators in a remote desert area. Prepared Well Testing Manual for Onshore Operations, including pump tests.
World-wide Prepared detailed test designs for approximately 30 well tests.
Gulf of Mexico,

USA

Prepared well test planning, reservoir evaluation and production problems section of the Deepwater Testing Guidelines under a sub-contract to H.O. Mohr Research and Engineering
World-wide Prepared Deepwater Well Testing Guidelines.