Course Description |
Client |
Date |
| Reservoir Engineering |
| Introduction to Reservoir Engineering |
Petroleum Society of CIM, CPC/PRC |
1990-2008 |
| Introduction to Waterflooding |
Petroleum Society of CIM, EnCana |
1994-2008 |
| Optimizing Existing Waterfloods |
Petroleum Society of CIM |
1999-2008 |
| Practical Decline Analysis |
Petroleum Society of CIM |
2001-2008 |
| Practical Material Balance Techniques |
EnCana |
1999-2008 |
| Production and Well Engineering |
| Well Completions and Workover Operations |
Petroleum Society of CIM, EnCana |
1991-2008 |
| Well Completions and Workover Design |
Petroleum Society of CIM, EnCana, IHRDC, Mobil, CPC/PRC |
1987-2008 |
| Well Performance analysis Using WEM Software |
Anadarko, EnCana, Devon, IHRDC, Mobil, Petro-Canada |
1995-2002 |
| Optimized Gas Well Completions |
Petroleum Society of CIM, EnCana, SWPI/D&S |
1994-2002 |
| Gas Well Dewatering |
Devon, EnCana, SWPI/D&S |
1995-2002 |
| Horizontal and Multilateral Well Completions |
EnCana, IHRDC/ONGC, SWP/D&S |
1995-2002 |
| Complex Well Completions (Sour & HPHT) |
Petroleum Society of CIM |
2001-2002 |
| Integrated Petroleum |
| Petroleum Engineering Primer |
Sable Offshore Energy Project |
1998 |
| Petroleum Engineering for Non-Specialists |
Apache Canada, Petroleum Society of CIM, Petro-Canada, Petro Vietnam/SovPetro |
1992-1999 |