rubix
 
 
 
 
  INTEGRATED PETROLEUM
ENGINEERING EXPERIENCE
Heavy Oil and Bitumen Experience

Location
Model Description
Long Lake, Canada Audit of geological description and modelling; OOIP and Recoverable Resource assessments, including the simulation models for the pilot and commercial areas; the drilling schedule and cost estimates; and SAGD production and OPEX forecasts used in economic models.
Various Fields, Northeastern Alberta, Canada Benchmark unit technical cost study of seven SAGD projects, involving geologic description of the McMurray formation, assessment of reservoir quality, identification of gas/water zones, estimation of capital and operating costs, and thermal simulation to forecast production performance.
Screening review of primary heavy oil reservoirs suitable for proposed “Below Reservoir Wellhead ” development technology.
Wainwright/

Provost, Canada

Evaluation of reservoir architecture and geological controls on water coning/cusping in Lower Manville Channel oil pools to help design infill drilling campaign.
Optimization of a mature heavy oil waterflood.
Chard, Canada

Integrated geological/ simulation modelling (using IRAP RMS and Eclipse) to assess the impact of gas zone depletion on ultimate recovery of the underlying bitumen using SAGD process. Evaluation included 3-D static reservoir modeling, history matching of pressure data, and thermal simulation. The results were used as evidence in the AEUB Chard Gas/ Bitumen hearing.
Hamaca Field, Venezuela

Quantify the predicted benefit of multi-lateral wells for optimizing primary production.

Reserve estimation and production forecast for primary horizontal/ multi-lateral wells and steamflood EOR development options.

Artificial lift studies for cold production of the heavy oil from multi-lateral horizontal wells and for thermal wells. Also reviewed progressive cavity pump applications for induced sand production.

Simulation of CSS and steamflood recoveries using horizontal producers and S-shaped injectors for the 9oAPI oil, including well spacing, comparison of horizontal and high angle vertical wells, cyclic steam and steam drive. A Joint project with HOR – Heavy Oil Recovery Technology.

Evaluated sand production as a stimulation technique in primary cold production to achieve a negative skin (currently a common practice in the Lloydminster area of Canada).

Gaosheng Field, China

Advised TRD of RIPED Institute in Beijing, China, on steam stimulation studies. Joint project with HOR – Heavy Oil Recovery Technologies.

Audited CSS resource estimates and generated base oil production forecast for contract negotiations on a rehabilitation project.

Evaluated heat losses with various completion configurations using steam subroutines in WT-PROD simulation software.

Patos-Marinza Field, Albania

Evaluated the remaining reserves and the net worth, including periodic updates for funding agency. Assisted the joint venture company in developing a strategy to enhance recovery and production.


Estimated primary production optimisation by workovers (re-perforating and sand clean-outs), pump optimisation, PCP applications, and recommending core testing program on the mature heavy oil field (9–17oAPI).

Evaluated sand production as a stimulation technique in primary cold production to achieve a negative skin (currently a common practice in the Lloydminster area of Canada).

Reviewed thermal casing failures. Reviewed casing and tubing string design modifications under yield in thermal wells.

Surmont Field, Alberta, Canada Prepared reviews of artificial lift options (reciprocating, progressive cavity, gas lift, and ESP) for SAGD processes at reduced operating pressures for the 1997 AEUB Gas/ Bitumen Production Review Inquiry and the 2000 Surmont Hearing.
Various Fields, Canada

Primary and enhanced depletion plan for the Lloydminster Pool Salt Lake (14 API), Medicine Hat Glauconite pool (16 API), Buffalo Coulee Bakken (13 API), Wainwright Sparky (22 API).
Various fields in China, Australia, Kazakhstan, Egypt, Venezuela, and Canada

Quantify the predicted benefit of multi-lateral wells for optimizing primary production.

Specialist support to SAGD Sand Control Task Force.

Horizontal well sand control studies for heavy oil primary and SAGD developments.

Artificial lift studies and optimization including reciprocating, progressive cavity, gas lift, and ESP for heavy oil operations and SAGD.

Review of cased hole horizontal well multi-lateral completion technology to sump a pump for low pressure SAGD steamflood and primary operations

Conceptual design of alternate single well SAGD completion (horizontal injector producer, injecting steam at the toe) via insulated coiled tubing and production at the heel by pump or steam lift.

Well performance and artificial lift courses that specifically addressed Canadian and California Heavy Oil Production Problems.